h1{color:#0a2540;font-size:30px;margin-top:8px}
h2{color:#0a2540;font-size:22px;margin-top:32px;border-bottom:2px solid #059669;padding-bottom:6px}
h3{color:#064e3b;font-size:17px;margin-top:18px}
.skh-banner{background:#ecfdf5;border:2px solid #059669;padding:20px 24px;border-radius:6px;margin:0 0 24px 0;box-shadow:0 1px 4px rgba(5,150,105,0.12)}
.skh-banner p{margin:8px 0}
.skh-banner .label{font-weight:700;color:#065f46;font-size:13px;letter-spacing:0.08em;text-transform:uppercase;margin:0}
.skh-banner .headline{font-weight:700;color:#064e3b;font-size:22px;line-height:1.35;margin:8px 0 12px 0}
.skh-banner .body{color:#1a1a1a;font-size:15px;line-height:1.6;margin:0 0 12px 0}
.skh-banner .phones code{background:#fff;padding:2px 8px;border-radius:3px;color:#064e3b;font-size:15px}
.skh-banner .verified{color:#6b7280;font-size:12px;margin:8px 0 0 0}
.cta{display:inline-block;background:#059669;color:#fff;padding:12px 24px;border-radius:4px;text-decoration:none;font-weight:600;margin:8px 0}
.callout{background:#fff7ed;border-left:4px solid #f97316;padding:16px 20px;margin:20px 0;border-radius:4px}
.verify{background:#fef2f2;border-left:4px solid #dc2626;padding:12px 16px;margin:16px 0;border-radius:4px;color:#7f1d1d;font-size:14px}
table.eligibility{width:100%;border-collapse:collapse;margin:20px 0;font-size:14px}
table.eligibility th,table.eligibility td{padding:10px 14px;border-bottom:1px solid #e5e7eb;text-align:left}
table.eligibility th{background:#f8fafc;font-weight:600;color:#0a2540}
.footer-note{margin-top:32px;padding-top:16px;border-top:1px solid #ccc;color:#666;font-size:13px}

Kentucky Strengthen Kentucky Homes (SKH) Program

HECS is an approved evaluator for the Kentucky Strengthen Kentucky Homes (SKH) program.

Home Energy & Comfort Solutions Inc. (HECS) — John Sabbak, La Grange, KY — is independently listed on the
official Kentucky SKH Certified Evaluator directory. SKH grant applicants can name HECS as their FORTIFIED evaluator.

Official directory listing — both numbers route to HECS:
(502) 643-7160 (listed on skh.ky.gov)
  |  
(859) 983-7382 (primary business line)

Last verified: September 07, 2026 · Source: skh.ky.gov/CERTEVALCONTACT.ASPX

SKH Process & Timeline — From Application to FORTIFIED Certificate

The Kentucky Strengthen Kentucky Homes (SKH) program follows a defined process from homeowner application through FORTIFIED designation. This page walks through each milestone and the typical timeline. Always confirm current process at insurance.ky.gov — program rules change annually.

Call (859) 983-7382 — process scoping

The 7-step SKH process

Step 1 — Homeowner applies to SKH

The homeowner submits the SKH application through the Kentucky Department of Insurance at insurance.ky.gov. The application captures property address, homeowner info, insurance carrier, and project details. SKH reviews eligibility per current program rules. You do NOT need a contractor or evaluator engaged at this step. You do need to know which approved evaluator you intend to name — HECS is on the official directory at skh.ky.gov.

Step 2 — Homeowner receives eligibility decision

SKH notifies the homeowner of grant decision per current program rules and timing. Do not begin reroof work until you have the grant decision in writing (or have decided to proceed without grant funding for the insurance-discount path).

Step 3 — Homeowner engages HECS + a roofing contractor

After grant approval, the homeowner engages HECS as the FORTIFIED evaluator and separately engages a qualified roofing contractor to perform the FORTIFIED Roof installation. HECS is independent of the contractor per IBHS rules — see SKH contractor vs evaluator.

Step 4 — Pre-roof site visit by HECS

HECS performs the pre-roof visit: photographs existing deck condition, measures roof slope and square footage, records visible structural concerns. Photos from this visit are required for the IBHS submission. Schedule HECS before shingles are removed — skipping the pre-roof visit is the most common cause of incomplete FORTIFIED packages.

Step 5 — Reroof + mid-roof inspection during deck exposure

The roofing contractor performs the FORTIFIED Roof installation. HECS performs the mid-roof inspection during deck exposure (after tear-off, before underlayment) — the most critical visit. HECS photographs the deck attachment pattern, sealed-deck taping, and nail type/spacing at this visit. The contractor coordinates timing with HECS so the inspection does not slow the project.

Step 6 — Post-roof inspection by HECS

After the new roof covering is installed, HECS performs the post-roof inspection. HECS verifies the roof covering product (must match the IBHS approved-roof-covering list current at install date), measures drip edge, photographs final attachment. HECS then assembles the FORTIFIED designation package: photos, measurements, contractor coordination notes, designation form.

Step 7 — IBHS FORTIFIED designation + SKH review

HECS submits the FORTIFIED designation package to IBHS. IBHS reviews and issues the official FORTIFIED certificate (typically within a few weeks). SKH then reviews the package per its own grant rules. Homeowner receives the FORTIFIED certificate and the SKH grant funds per program rules. Insurance carrier applies the FORTIFIED premium discount on the homeowner’s next renewal.

Typical timeline

Milestone Typical timeframe
Step 1: SKH application Homeowner-controlled; submit when ready
Step 2: Eligibility decision
[VERIFY: confirm current SKH review SLA at insurance.ky.gov]
Step 3: HECS + contractor engagement 1-2 weeks (HECS proposal within 24 hours; contractor selection separate)
Step 4: Pre-roof visit 1-3 weeks after Step 3 (depends on contractor schedule + weather)
Step 5: Reroof + mid-roof inspection 1-3 weeks of construction (typical residential reroof)
Step 6: Post-roof inspection Within 1 week of reroof completion
Step 7: IBHS FORTIFIED certificate + SKH review Several weeks (IBHS processing + SKH program review)
[VERIFY] John should confirm the exact SKH review SLA and IBHS processing timeframe from current program sources, then update the table.
Total typical timeline from SKH application to FORTIFIED certificate: 3-6 months for most Kentucky projects. SKH seasonality and contractor availability can extend the timeline during peak storm season (spring/summer).

What happens at each milestone — quick reference

  • Pre-roof visit: HECS photographs the deck. Contractor does NOT need to be present.
  • Mid-roof inspection: HECS visits during the short window when the deck is exposed. Contractor coordinates timing.
  • Post-roof inspection: HECS verifies final roof covering + drip edge.
  • IBHS submission: HECS assembles and submits. Homeowner does not handle paperwork.
  • SKH review: SKH program reviews per its own rules. HECS does not advocate for grant approval.

Related resources