EarthCraft Certification in Simpson County, KY

HECS delivers EarthCraft Certification across Simpson County and south of Warren County along I-65. HECS is an NCI-certified, Louisville-Kentucky-headquartered testing firm serving Kentucky since 2009. County-specific service includes a free scoping call, a fixed-fee 24-hour proposal, and a certified report that passes program review in the first round.

Why Simpson County property owners choose HECS for EarthCraft Certification

Local code officials, builders, developers, and program administrators across Kentucky trust HECS for third-party EarthCraft Certification because we deliver:

  • NCI-certified field technicians — every HECS tech holds current EarthCraft Certified Verifier (Southface Institute) credentials. The person who takes the readings is the person who signs your report.
  • Fixed-fee proposals in 24 hours — not estimates, not time-and-materials. We quote travel cost up front, so the invoice matches the proposal.
  • Reports that pass program review — Southface EarthCraft program submission, state utility rebate coordination. We deliver in the format your reviewer needs.
  • Local code expertise — Bowling Green projects reference the 2018 Kentucky Building Code (based on 2015 IBC) with Warren County local amendments. IECC 2015 is the prevailing energy code; Western Kentucky University-area multifamily often targets EarthCraft or NGBS Green.
  • One project manager for the whole job — TAB, blower door, energy cert, FORTIFIED: we coordinate scheduling so you make one phone call, not five.

How the EarthCraft Certification project works in Simpson County

  1. Free scoping call (under an hour). Call (859) 983-7382 or email hecs@hecsusa.com with your project type, building size, program of record, and rough-in or final inspection schedule.
  2. Fixed-fee proposal within 24 hours. Deliverables, schedule, and the credentials of the tech who will sign your report — all in writing.
  3. Field work by NCI-certified techs. Most EarthCraft Certification projects in Simpson County complete in 2-4 site visits using calibrated instruments and certified airflow hoods.
  4. Certified report delivered within one week. Format matches your program — AABC, NEBB, NCI, RESNET, ENERGY STAR, NGBS, EarthCraft, FORTIFIED, or custom code-official.
  5. Program submission support. We coordinate with your rater, commissioning authority, code official, or program reviewer as needed.

Frequently asked questions — EarthCraft Certification in Simpson County

How much does EarthCraft Certification cost in Simpson County?

HECS quotes EarthCraft Certification projects on a fixed-fee basis after a free scoping call. Cost depends on building size, project complexity, and program requirements. Most Simpson County projects fall within our standard Midwest service rate. Call (859) 983-7382 or email hecs@hecsusa.com for a project-specific quote within 24 hours.

Does HECS travel to Simpson County for EarthCraft Certification projects?

HECS serves the Bowling Green metro from our Louisville KY headquarters; most projects are a 2.5-hour drive south. Travel cost is quoted up front in the proposal and bundled with related projects when possible.

What certifications does HECS hold for EarthCraft Certification in Kentucky?

HECS field technicians hold EarthCraft Certified Verifier (Southface Institute) credentials (valid through December 2026). HECS is also an IBHS FORTIFIED Home Evaluator, RESNET Certified HERS Rater, ENERGY STAR Multifamily Reviewer, NGBS Green Certified Verifier, and EarthCraft Certified Verifier. Every HECS report is signed by a credentialed technician — never outsourced, never subcontracted for the signature.

Can HECS coordinate with my Simpson County code official or commissioning authority?

Yes. HECS regularly coordinates EarthCraft Certification with local code officials, commissioning authorities (CxA), and HERS raters across Kentucky. We deliver reports in the format your reviewer requires and attend coordination meetings when requested. References from Simpson County-area code officials and developers are available on request.

How quickly can HECS start a EarthCraft Certification project in Simpson County?

Most EarthCraft Certification engagements in the Simpson County metro schedule within 2-4 weeks of contract signing. Pre-construction document reviews and pre-drywall inspections are typically scheduled first; final / performance-test visits follow the contractor close-out schedule. Call (859) 983-7382 with your project timeline and we will confirm availability within 24 hours.

What does HECS do if the building does not pass EarthCraft Certification testing in Simpson County?

If a measured value is outside the prescribed tolerance (e.g., ACH50 over the ENERGY STAR 3 ACH target, or duct leakage to outside above RESNET 380 thresholds), HECS documents the failure with photos and identify-codes for the offending building assemblies. We then work with your GC to schedule a targeted re-test of the failed assemblies after sealing. Re-tests are quoted at a fixed fee per visit (most projects pass after one targeted re-seal). Call (859) 983-7382 to discuss a specific failure-mode case.

Related HECS services near Simpson County

Get a Simpson County EarthCraft Certification proposal

Call (859) 983-7382 or email hecs@hecsusa.com with your project type, building size, and inspection schedule. Most scoping calls take under an hour. Within 24 hours you receive a fixed-fee proposal — not an estimate — with deliverables, schedule, and the credentials of the tech who will sign your report.

Contact HECS   📞 (859) 983-7382

Related HECS services in this region

Frequently asked questions — Simpson County process + scheduling + code

How quickly can HECS schedule an EarthCraft certification in Simpson County?

Most EarthCraft certifications in the Simpson County metro are completed in 2-4 site visits plus a desktop review. Pre-drywall, pre-cover, and final inspections are coordinated with your general contractor. Call (859) 983-7382 with your timeline and we confirm availability within 24 hours.

Is HECS certified by Southface for EarthCraft?

Yes. HECS is on the Southface EarthCraft Verifier directory. Every EarthCraft certification is signed by a credentialed Verifier and verified under the EarthCraft Builder, EarthCraft Multifamily, or EarthCraft Renovation program.

What EarthCraft certification tiers are available in Simpson County?

EarthCraft offers Tier 1 through Tier 4 certification tiers. The performance requirements increase at each tier (energy efficiency, durability, indoor air quality, water management, site stewardship). HECS will project-score your design at the scoping call so you know what tier your project targets before construction begins.

What EarthCraft requirements does HECS verify in Simpson County?

HECS verifies the service against the applicable Kentucky state energy code, ASHRAE standards, and program-specific certification requirements. EarthCraft requires lot design (site + lot selection), resource efficiency (energy, water, materials), indoor environmental quality (HVAC, ventilation, combustion safety), and durability / disaster resistance. The verifier confirms each requirement on-site via checklist completion and supporting documentation.

How does EarthCraft relate to utility incentive programs in Simpson County?

EarthCraft certification is recognized by many state utility rebate programs in the Southeast and Mid-Atlantic for energy-efficiency upgrades. HECS coordinates with the local utility program of record and submits the EarthCraft package to Southface for accreditation.

Does HECS coordinate EarthCraft submissions to Southface for Simpson County projects?

Yes. HECS files the EarthCraft certification package directly to Southface and supports your rater / energy modeler with the documentation package. The Kentucky-specific certification tier is determined at the final inspection.